As Per IS: 2720 (P-VII)
Specification :
Soil compaction is of utmost requirement for
constructing earth fill for dams, canal embankments, reservoirs,
highways, runways and railways. The relationship between soil
moisture content and compacted dry density largely determine the
construction specifications and quality control of compacted
earthfill. To check the strength of the soil the density of the soil is
taken into account and hence the quality control is checked
otherwise.
(SL-GT-016) | Compaction Mould, complete with Collar and Base Plate | Compaction rammer |
---|---|---|
A. Proctor Compaction (Light) | 100mm Internal Dia x 127.3mm Height,1000ml volume (Mild Steel) | 2.6 kg x 310mm fall |
B. Proctor Compaction (Light) | 150mm Internal Dia x 127.3mm Height,2250ml volume (Mild Steel) | 2.6 kg x 310mm fall |
C. Proctor Compaction (Heavy) | 150mm Internal Dia x 127.3mm Height,2250ml volume (Gun Metal) | 4.89 kg x 450mm fall |
D. Proctor Compaction (Heavy) | 100mm Internal Dia x 127.3mm Height,1000ml volume (Gun Metal) | 4.89 kg x 450mm fall |